USDPrices in US dollars +254 719 771839info@streamedgesolutions.comTrack an order
Integrations · Connections

ERP Integration Service

Connect your ERP to the systems around it, once we have proved it can be connected

  • Full refund before work starts
  • Scope confirmed in writing
  • Secure checkout
Delivery
Remote setup
Turnaround
Feasibility review in 1–2 weeks
Billing
One-off payment, or 50% deposit
Product code
SES-INT-612
Last updated
22 October 2026

Overview

A one-off remote project connecting the ERP your business runs on to another system, so figures stop being exported and re-typed between them. Whether it can be done at all depends entirely on what your ERP exposes, which is why a paid feasibility review comes first and is the honest part of this product.

ERP integration is the area where suppliers most often promise first and discover later. Some ERPs publish a documented API and the work is ordinary. Others expose nothing but a nightly file export, a database the licence forbids you to read, or an interface module the vendor sells separately. We review your specific installation and version before any development, report plainly what is possible, and where the answer is that the job cannot be done this way, we say so and stop.

The problem it solves

Your ERP holds the authoritative numbers, and every other system in the business is fed from it by somebody exporting a file and re-typing the contents into something else.

What’s included

What you get

  • A paid feasibility review of your specific ERP, its version and its licence terms
  • A written statement of what the ERP genuinely exposes, and what it does not
  • One integration flow built between the ERP and one other system
  • Field mapping and a system-of-record decision agreed in writing before development
  • Queuing and retry, so an ERP batch window does not lose records
  • An exceptions queue for records the ERP rejects
  • Failure alerting and a run log for diagnosis

Included in this package

  • Feasibility review of one ERP installation
  • One integration flow to one other system
  • Field mapping and system-of-record documentation
  • Queuing, retry and idempotent processing
  • Exceptions queue and failure alerting
  • Parallel-run verification before go-live

Delivered to you

  • A written feasibility report on what your ERP exposes and on what terms
  • A documented field mapping and system-of-record decision
  • One working integration flow between the ERP and one other system
  • An exceptions queue and failure alerting
  • Technical documentation for whoever maintains it next

Not included

  • ERP licence, module and user fees, which you pay your ERP vendor directly, including any interface or API module they sell separately
  • Work your ERP cannot support. If the feasibility review finds no usable route we report that and cancel or rescope under the refund policy, rather than building a fragile workaround
  • Reading an ERP database directly where the vendor’s licence forbids it, which we will not do even where it is technically possible
  • Changes inside the ERP itself, its customisations or its business logic
  • ERP implementation, configuration or consultancy, which belongs to the vendor or your implementer
  • Any partner, reseller or certified status with an ERP vendor, which we do not hold and do not claim

How it works

  1. Feasibility review, done first and paid forWe examine your ERP’s version, its API or export capability, and the licence terms governing access to its data. This is the deliverable that decides whether anything else is possible.
  2. Report honestlyYou get a written answer: a full API integration, a limited file-based one, or that it cannot be done this way at all. Where the answer is no, we stop and settle under the refund policy rather than building something that cannot work.
  3. Agree the mappingField by field, including which system is authoritative and what happens to records with no home on the other side.
  4. Build against a test companyDevelopment runs against a test or copy company file, never against your live ERP data.
  5. Parallel runOne period is run both the old way and the new way and the two are compared, before anyone relies on it.
  6. Go live with exceptionsRecords the ERP rejects are queued for a person, never silently dropped, and failures raise an alert.

Delivery and timing

Remote setup. Feasibility review in 1–2 weeks; the integration 3–6 weeks after it, where the review says it is possible. Nothing is shipped; everything is handed over online. See the delivery policy and refund policy.

Requirements

What we need from you

  • Your ERP name, version and hosting arrangement, plus the licence terms covering access to its data
  • An account and API credentials issued to your business by the ERP vendor or your implementer
  • A test or copy company file for development, where one can be produced
  • A decision-maker who can settle which system is authoritative for each field
  • Acceptance that feasibility is decided by what the ERP vendor exposes, not by us

Who it suits

  • Manufacturers and distributors running an ERP alongside other tools
  • Businesses whose website and ERP hold the same stock figures separately
  • Finance teams re-keying ERP figures into reporting spreadsheets
  • Companies told by another supplier that their ERP "cannot integrate"
  • Organisations on an older on-premises ERP version

Questions about this solution

What if our ERP has no usable API?

Then the honest answer is that the job cannot be done that way, and the feasibility review exists to reach it before you have paid for development. Some ERPs offer only a scheduled file export, which supports a one-way batch integration but not live two-way sync. Where nothing usable exists at all we say so, hand over the written finding, and settle under the refund policy.

Our ERP vendor sells an interface module. Do we still need you?

Possibly not, and we will say so if their module does what you need. Where a vendor charges for API access, that fee is yours and is paid to them directly. We build against what your licence entitles you to use, and we cannot unlock a capability you have not bought.

Can you read the ERP database directly?

Usually we will not, even where it is technically possible. Many ERP licences forbid it, direct reads break on the vendor’s next upgrade, and writes made that way can corrupt data the application assumes it controls. If no supported route exists, that is a real finding rather than an invitation to go around it.

Why is this priced "from"?

Because the range is genuinely wide: a modern cloud ERP with a documented API is ordinary work, while a fifteen-year-old on-premises installation may not be integrable at all. The figure covers the feasibility review and one straightforward flow. Anything beyond that is priced in writing after the review, and you are free to stop there.

Related solutions

Often bought alongside ERP Integration Service, or close alternatives.

More in Integrations

Prices in US dollarsPublished on every listing, with what is included and excluded.

Scope confirmed in writingWithin one working day, before you pay anything.

Secure hosted paymentCard details go to the payment provider, never to us.

Full refund before work startsCancel any order before work begins.